×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Friday
16
Jan 2026
weather symbol
Athens 16°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

Latsis Group: This is the new project of Aura Residential’s 219 apartments in Elliniko

The new project with 4 buildings of up to 50 meters has now progressed to the starting point, with the completion of the procedures for inclusion in standard environmental commitments for its first phase

Newsroom January 16 11:36

The new residential project with 219 apartments within the former Elliniko airport site by Aura Residential SA, which includes a complex of four high-rise buildings up to 50 meters high on an area of 16 acres, is moving to the next step of environmental licensing.

This is the new residential complex designed and implemented by the joint venture formed by the Latsis Group through Xeris Ventures (80%) in partnership with Elliniko S.A., a subsidiary of Lamda Development (20%), having now proceeded with the permitting process, with the completion of the procedures for the submission to standard environmental obligations for the first phase of the project, i.e. the permit for excavation and construction of retaining walls.

Overview of the Project’s Financials and Development Plan

Based on the latest assessment report from late 2024, the market value of the 15,944-square-meter plot is estimated at €33.13 million. The capital expenditures (CAPEX) for constructing four residential buildings are expected to reach around €170 million, while infrastructure costs are projected at approximately €11.5 million.

What the Project Includes

The land has a maximum allowable building footprint of 4,783 m² and a total buildable area of 28,699 m², mainly designated for residential use. The development also includes a small café and two underground floors for parking and auxiliary spaces. The site is directly adjacent to the Metropolitan Park and offers sea views.

According to the architectural plans, about 26,300 m² will be divided among 219 apartments of various sizes (1 to 4 bedrooms). The café will cover about 200 m².

Facilities and Layout

The design features 287 parking spaces spread over the two underground levels. The complex will offer residences both for rent and sale.

  • The first building (T1) will have 11 above-ground floors, including 5,832 m² of living space and a standalone café.
  • The second (T2) will cover 6,418 m² with 12 floors.
  • The third (T3) will have 5,832 m² across 11 floors.
  • The fourth building (T4) will offer 8,239 m² on 11 floors, with the top five floors gradually set back, including green terraces and small outdoor pools for residents.

Capacity and Use

The complex can accommodate about 1,570 people, with a maximum resident count of about 1,460. Under normal occupancy, about 70% (roughly 1,020 people) will be daily users.

To avoid dense construction and maintain harmony with the surrounding area, four separate buildings have been planned. This approach creates a welcoming, human-scale environment and maximizes outdoor space, complementing the Metropolitan Park and nearby green areas. The layout also allows landscaped spaces to extend under the buildings.

At this stage of environmental permitting, the removal of three existing trees is planned. These trees cannot be transplanted due to extensive damage and disease.

Surrounding Environment and Design Features

The buildings’ perimeter arrangement forms a large central garden, integrating the ground-level outdoor spaces and extending toward the western and southern sidewalks and the Metropolitan Park to the east. The outdoor areas are elevated relative to surrounding streets, allowing smooth transitions between private and public spaces while offering panoramic views from the garden.

The design incorporates bioclimatic principles. High ceilings on the ground floors (pilotis) allow natural airflow beneath the residential floors, helping to regulate temperatures passively. Pedestrian movement and gentle mobility are prioritized, with vehicle access limited to service and emergency vehicles only. Private cars are confined to underground parking.

>Related articles

The Mayor of Sikinos’ emotional farewell to the students who marched on the island for October 28th – See the video

Metro: See which stations will close every night from today until Thursday

Metro: Closing hours and final schedules for today

Ask me anything

Explore related questions

#Elliniko#Latsis Group
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Where insects go in winter

January 16, 2026

Zelensky: If an agreement is reached, we are ready to sign even next week

January 16, 2026

Actress Melpo Zarokosta dies at 93

January 16, 2026

11 Iconic meze dishes from Volos

January 16, 2026

Sports broadcasts: Where to watch the Conference League play-off draw, the derby in volleyball, and the EuroLeague

January 16, 2026

Study in Greece: International students apply for a place in Greek universities through a single platform

January 16, 2026

Users on X respond to Rama’s comments on whether modern Greeks are descendants of the ancient Greeks

January 16, 2026

Cycladic Identity Initiative launches fourth funding phase to preserve the Cultural and Natural Heritage of the Cyclades

January 16, 2026
All News

> Greece

Study in Greece: International students apply for a place in Greek universities through a single platform

New internationalisation services from Study in Greece - Applications can be made through the common platform @SiG (Apply to Study in Greece) which will act as a central gateway for international students

January 16, 2026

Users on X respond to Rama’s comments on whether modern Greeks are descendants of the ancient Greeks

January 16, 2026

Cold wave from Ukraine to hit Greece: Temperatures drop to 10°C, Gale-Force winds in the Aegean and Ionian Seas

January 16, 2026

Mercosur agreement sparks concern over olive export tariffs: Greek and European producers face 12.6% duty

January 16, 2026

When Triodion 2026 begins – Carnival, Lent, and Easter in Greece

January 16, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα