×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Thursday
15
Jan 2026
weather symbol
Athens 13°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> World

Undersea power cable soldiers on despite WWII bombs

Unexploded bombs, mines, ordinances & downed aircraft are scattered at the bottom of the sea

Newsroom August 1 01:50

A large-scale energy interconnector project linking the United Kingdom to mainland Europe is pressing on, despite the discovery of wartime bombs and mines in the cable’s path.

An energy project worth nearly €700m, which is intended to connect the UK’s national grid to power markets in Denmark and Norway, is having to contend with unexploded bombs, mines, ordinances and downed aircraft.

The Nemo Link, which began construction in late 2015, is nearly halfway complete and is due to come online in 2019. But its planned route crosses one of the world’s busiest shipping lanes and the venue for some of the most violent fighting during World War II: the Channel.

After surveys found dozens of wartime explosives on the seabed and floating in the water, the project’s backers called in the navies of Belgium, France and the UK in order to deal with the bombs and mines. This has mostly involved controlled explosions rather than removing the objects.

Nemo Link Project Director Mike Elmer told The Guardian that a 14th century ship found in French waters could have seriously delayed construction had it been discovered on the cable’s route, as it is now being treated as an archaeological find by the authorities.

He explained that “as soon as they designate [it] as archaeology, a 100-metre exclusion zone is put through the whole thing”.

The 80-mile interconnector will stay largely on course despite the deadly discoveries but will avoid parts of the wreckage of an aircraft, which could potentially be a war grave.

The UK currently has four interconnectors and eight more, including the Nemo Link, are in the works. Britain is currently increasing the amount of energy it generates from renewables and these undersea cables are an effective way of guaranteeing energy supply.

>Related articles

Storm Goretti sweeps France, Britain, Germany and the Netherlands: Thousands of households without power and flight cancellations

Any Western troops in Ukraine will be considered “legitimate targets”, Russia warns

Wave of bankruptcies in Germany: Which businesses are hit hardest

Recently, the EU announced significant funding for an interconnector that will link France with Ireland and has been dubbed the ‘Brexit cable’, due to its target of reducing the Republic’s energy dependence on the UK.

Source

Ask me anything

Explore related questions

#britain#cable#downed aircraft#europe#mines#ordinances#power#undersea#Unexploded bombs#UXO
> More World

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

New cultural route at the Acropolis highlights the historic Koili Odos

January 15, 2026

Snow cover in Greece surpasses the seasonal average in January 2026

January 15, 2026

Trump for Reza Pahlavi: “Very likable, but I don’t know if the Iranians will accept him”

January 15, 2026

Vicky Chatzivasileiou: “I never gave up anything for television — It’s not my whole life”

January 15, 2026

Oil prices fall 3% after Trump’s statements on Iran

January 15, 2026

Erfan Soltani has not been sentenced to death, Iranians now say

January 15, 2026

Nikki Glaser reveals jokes cut from her Golden Globes hosting set

January 15, 2026

Greece welcomes the Frigate Kimon alongside the Battleship Averoff and the Trireme Olympias – Exploring the connection between these “Ships of Victory”

January 15, 2026
All News

> Politics

Mitsotakis’ meeting with farmers: Blockades may ease after announced measures

If the roads are opened, as they were during the holidays (with tractors on the side), then Friday is a possible day - If the farmers play... delays, then the government will not be in a hurry to see them and we will go from Monday

January 15, 2026

RealPolls: New Democracy above its European election result, Plefsi returns to second place – With a change of leader ND loses nearly two points, PASOK gains 5.5

January 14, 2026

Pierrakakis: We will achieve even more through collective effort

January 14, 2026

Plakias on Karystianou: There isn’t just one “mother of Tempi,” there are many – No relatives will follow her into her party

January 14, 2026

Tsiaras on farmers: The State cannot operate with obsessions, egos, and stubbornness — We are waiting their response

January 14, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα