×
GreekEnglish

×
  • Politics
  • Diaspora
  • World
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Cooking
Sunday
18
Jan 2026
weather symbol
Athens 6°C
  • Home
  • Politics
  • Economy
  • World
  • Diaspora
  • Lifestyle
  • Travel
  • Culture
  • Sports
  • Mediterranean Cooking
  • Weather
Contact follow Protothema:
Powered by Cloudevo
> Economy

Greece: Gastrade received the Final Investment Decision (FID) for INGS Alexandroupolis

The FSRU with a capacity of 153.500 sq.m. LNG will be connected to the national natural gas network of Greece with a 28 km long pipeline

Newsroom January 28 12:55

Gastrade SA announces that the Final Investment Decision (FID) for the construction of the Independent Natural Gas System (INGS) of Alexandroupolis took place on Friday.

Obtaining the FID is the last but most important step in starting construction work. As unanimously approved by the General Meeting of Shareholders of the company, all the necessary conditions for the implementation of the project have been secured and the project is proceeding according to schedule.

The construction and operation of the Liquefied Natural Gas (LNG) Terminal of Alexandroupolis will contribute to energy security, liquidity and energy pluralism of Greece and the whole of SE Europe, strengthening the strategic role of Greece and offering alternative sources and natural resources in the area.

See Also:

>Related articles

President of Air Traffic Controllers: Another communications blackout possible in the near future

Trump threatens tariffs against those who oppose U.S. plans for Greenland

X is down, thousands report problems

Elon Musk: Robot a top priority for Tesla

The Floating Storage and Regasification Unit (FSRU), with a capacity of 153,500 sq.m. LNG, will be connected to the national natural gas network of Greece with a 28 km long pipeline, through which the gasified LNG will be transported to the markets of Greece, Bulgaria and the wider region, from Romania, Serbia and Skopje, as far as Moldova and Ukraine.

The terminal is expected to be operational by the end of 2023, with the contracted gasification capacity already reaching up to 50% of the technical capacity of 5.5 billion sq.m. per year. It is noted that INGS Alexandroupolis has been included and financed by the Operational Program of the National Strategic Reference Framework (NSRF) “Competitiveness, Entrepreneurship and Innovation 2014-2020” with the amount of public expenditure amounting to 166.7 million euros.

Ask me anything

Explore related questions

#Alexandroupolis#economy#energy#Final Investment Decision (FID)#greece#Independent Natural Gas System (INGS)#investments#Natural Gas#world
> More Economy

Follow en.protothema.gr on Google News and be the first to know all the news

See all the latest News from Greece and the World, the moment they happen, at en.protothema.gr

> Latest Stories

Erfan Soltani confirmed alive by Iranian Human Rights Group after days of uncertainty

January 18, 2026

Rescue operation underway for eight hikers on Mount Taygetus; four injured

January 18, 2026

Piers Morgan recovering in hospital after serious fall in London

January 18, 2026

Prime Minister Mitsotakis’ agenda: From talks with farmers’ representatives to Davos for investment outreach

January 18, 2026

Iraq veterans report long-term health concerns after a lack of medical screening for toxic exposure

January 18, 2026

Skirtsos: ‘After years of efforts, the first results on maritime safety are starting to become visible’

January 18, 2026

Politico: Europe for the first time considers tough response to Trump on Greenland tariffs, what is the Anti-Brexit Act

January 18, 2026

The backstory behind Trump’s decision not to attack Iran: The camps in the White House, the SMS from Tehran, and the calls from Arab allies

January 18, 2026
All News

> Politics

Prime Minister Mitsotakis’ agenda: From talks with farmers’ representatives to Davos for investment outreach

Talks with farmers expected to ease protests, followed by the prime minister’s participation in the World Economic Forum

January 18, 2026

Skirtsos: ‘After years of efforts, the first results on maritime safety are starting to become visible’

January 18, 2026

Mitsotakis: Greece will not be challenged by anyone with the Belharra frigates – Our goal is to support farmers with transparent subsidies

January 18, 2026

New legal migration rules for 90,000 pending residence permits

January 18, 2026

Mitsotakis on the Karystianou party: “There is a long distance between being the parent of a tragedy victim and being the leader of a political party”

January 17, 2026
Homepage
PERSONAL DATA PROTECTION POLICY COOKIES POLICY TERM OF USE
Powered by Cloudevo
Copyright © 2026 Πρώτο Θέμα